Temporary lowering of the Ottawa River water level upstream of the Carillon hydroelectric facility
Bulletins posted on 2025-07-04 by Hydro Quebec
Read Hydro-Québec’s bulletin > July 4, 2025 Bulletin (French only)
Back to archives
Bulletins posted on 2025-07-04 by Hydro Quebec
Read Hydro-Québec’s bulletin > July 4, 2025 Bulletin (French only)